EIKON was hired by Denton County for the remodel of an existing office space on the fourth floor of the Denton County Courts Building. The project consisted of a near-complete demolition of the 4,538-square-foot interior space.

The design called for converting this space into a new courtroom and support office area for the judge and staff. The courtroom was designed to match the updated courtrooms in the building, complete with isolated judge’s bench with a connecting corridor to the office and restroom. The courtroom was designed with state-of-the-art audio/visual equipment, giving the judge the ability to control all systems with touchscreen controls located at the bench. The office area included a conference room, workstation for copies/files, break area, jury room and four offices.