A master site plan was developed to facilitate current Road and Bridge East operations and allow for potential future expansions on a 20 acre site.  A new 3,400-square-foot office building with a stone and EIFS veneer is the focal point when arriving at the site. Offices for Commissioner Hugh Coleman and other personnel, a conference room and a centralized work area are located in this building.

A separate 6,700-square-foot mechanical shop contains a large crew room, small engine repair room, sign shop and three large work bays. Other elements of the project include a vehicle wash down area, fueling station, an onsite septic facility, material storage areas and a non-potable water well.