The existing 11-thousand-square-foot pool and two existing buildings were demolished in order to install a new 194,734-gallon pool, 1,630-square-foot restroom/concession building and 750-square-foot pool equipment building. The new aquatic center includes climbing walls, basketball goals, geysers, HydroDek play feature, beach entry, lounge shelf, diving board, and 2 slides. EIKON was also responsible for all associated piping, equipment, mechanical engineering and electrical systems as well as parking, paving, signage, landscaping, irrigation and lighting.