EIKON provided Civil and Architectural design services for the sales office and transfer station for a large steel manufacturer and distributor. Site design included rail access and detention design.

Along with the design, a drainage analysis was performed to determine the size of the detention pond in order to negate any downstream impacts of the new development on the storm water collection system utilized by the property. EIKON designed a multi-stage outfall system using common materials to mitigate four separate storm events and reduce consumption costs.