The City of Corinth originally selected EIKON to perform a facility needs assessment on an existing single-story, 33,000 SF facility. The final report contained sufficient information to determine the feasibility of acquiring the proposed building and property. In 2016 the City purchased the existing building on approximately 6-acres. EIKON was selected to master plan the entire site and provide full architectural and engineering services for the renovation and addition to the current building.
The public safety facility houses the police headquarters and fire administration staff. This facility underwent an extensive renovation and addition that provides both departments with adequate space for the foreseeable future. EIKON designed a layout that maximized shared spaces while maintaining each department’s autonomy and security for daily operations. The floor plan allows for welcoming public areas, shared meeting, fitness, and break room areas for both departments and allows for the security of the building to be maintained at all times.