The existing plant was over 400,000 SF consisting of the original building constructed in 1958 and an addition in 2003. Safran Seats hired EIKON to prepare construction documents to renovate several areas within the facility and an addition to the existing lobby for a new marketing showroom.
There were six separate areas identified: converting an existing 12,000 SF metal storage building into a warehouse for equipment, relocating a chemical storage area, renovating 12,500 SF of offices and the human resource area, converting a 9,000 SF manufacturing area to an employee cafeteria, the addition of new restrooms on an existing mezzanine, and a 1,900 SF addition to the existing lobby.